Business Data Recovery Terms
Edit Wiki..
1. Recovery time objective
The maximum time between an event and the time at which a system must be returned to operation.
2. Recovery point objective
The maximum acceptable time between the last available back-up and the time a disruption occurs.
There are 4 versions of this page.
Rollback
Back in Time (1 older revisions)
Forward in Time (2 newer revisions)
Add to del.icio.us






